Goldshell KD6 Profitability Calculator
Calculate profitability for the Goldshell KD6 (Blake2s). 29200 GH/s · 2630W · 0.09 J/GH · $10000
Blake2s Goldshell Air Cooling
$
Daily profit
$-6.31/day
Daily revenue$0.00
Daily electricity-$6.31
Daily profit$-6.31
Monthly profit$-189.36
Annual profit$-2,304
Daily KDA mined0.000000 KDA
Power draw2630W (63.1 kWh/day)
Pro Calculator PRO
Full cost analysis, 24-month ROI projection, break-even grid, and fleet calculator for Goldshell KD6
$
%
$
$
%
Extra power for cooling$
$
%
Revenue
Gross daily revenue$0.0000
Pool fee (1%)-$0.0000
Net daily revenue$0.0000
Costs
Electricity (ASIC)-$6.31
Total daily costs-$6.31
Profit
Daily profit before tax$-6.31
NET DAILY PROFIT$-6.31
| Period | Revenue | Costs | Profit |
|---|---|---|---|
| Daily | $0.0000 | $6.31 | $-6.31 |
| Weekly | $0.0000 | $44.18 | $-44.18 |
| Monthly | $0.0000 | $189.36 | $-189.36 |
| Annual | $0.0001 | $2,304 | $-2,304 |
Coins mined/day
0.000000 KDA
Revenue per kWh
$0.0000
Profit margin
-2646702746.5%
Daily kWh
63.1 kWh
Monthly elec. bill
$189.36
Goldshell KD6 Specifications
| Model | Goldshell KD6 |
|---|---|
| Manufacturer | Goldshell |
| Algorithm | Blake2s |
| Hashrate | 29200 GH/s |
| Power | 2630W |
| Efficiency | 0.09 J/GH |
| Cooling | Air |
| Noise | 75 dB |
| Coins | KDA |
| Price | $10,000 |
| Release | 2022-06 |
| Daily kWh | 63.1 kWh |
FAQ
Profitability depends on electricity cost. At $0.10/kWh, electricity alone costs $6.31/day. Use the simple calculator for a quick check, or the Pro calculator for detailed cost analysis with hosting, cooling, and maintenance costs.
The Goldshell KD6 uses Blake2s and mines: KDA.
The Goldshell KD6 operates at approximately 75 dB with air cooling. This is very loud -- industrial/garage placement recommended.